The Gulf Harbour Transformation: Questions and Answers

Written by Gulf Harbour | November 24, 2026

Gulf Harbour opens its renovated clubhouse in January 2027—the final project in a capital plan of about $30 million. Over nearly a decade, that plan has rebuilt the wellness center, the golf course, the tennis complex, Eagle Perch Island, and the clubhouse.

Here is the reasoning behind the plan and the methods used for each project.

Why did Gulf Harbour approach this as one plan?

Club leadership has described these projects as stages of a single long-term capital plan. The golf course and the clubhouse had both reached the age where major work was due.

The plan began with moving the golf shop to the sales center. The two largest projects, the golf course and the clubhouse, followed the same method. Members helped define what they wanted before design started, and each was built in a single phase.

How was the wellness center updated?

The renovated HarbourView Center for Sports & Wellness opened in 2018. It now houses TechnoGym equipment, more than 40 weekly fitness classes, the Day Spa, and a Trackman indoor simulator. Gulf Harbour is also recognized as one of America’s Healthiest Clubs by Prevo.

Why was the golf course redesigned?

The course had reached the age when mature trees shade and thin the turf, the thatch layer holds water instead of draining it, and the irrigation system nears the end of its life. Greens, bunkers, and irrigation all needed replacing. The real decision was whether to rebuild the course as it was or improve it in the process.

How did the golf course redesign come together?

Architect Kipp Schulties began in 2019 with member focus groups instead of a finished design. He split participants into four groups by skill level, and each group reviewed every hole on the course. Schulties then built a master plan around what members said they valued.

That plan produced varied tee angles. Landing areas open up from the forward tees, while the back tees bring bunkers and turn points into play. Greens were designed with about half of each surface open for bump-and-run shots and the rest protected for harder pin placements. The short game area was expanded at members’ request.

Why was the clubhouse renovated?

The clubhouse had reached the age where renovation was due. The plan needed to cover the building’s systems as well as more room to dine. It included storm hardening of the roof, windows, and doors, along with upgraded HVAC and fire suppression and new kitchen equipment. Member surveys also showed strong support for year-round covered outdoor dining, more waterside seating, and an updated interior.

How was the clubhouse plan developed?

Architect Peacock + Lewis presented early concepts at a member workshop in November 2023, and 966 members returned surveys afterward. Member subcommittees then worked with the architects on construction and interior design, and an owner’s representative joined to advise the Board. In April 2024, a four-session town hall presented 14 renderings and gathered more feedback.

General contractor Curran & Young’s first estimate came in above the Board’s target. In response, the committees identified value-engineering savings and scope reductions, and those were built into a single final design. Members approved it in February 2025 through a vote tabulated by an independent firm.

Why was the clubhouse built in a single phase?

The member Construction Committee concluded that the existing building could not be split into phases without a significant redesign. Schulties made a similar case for the golf course: phased work costs more and stretches disruption over years. The clubhouse closed for construction in June 2025.

What changed in the clubhouse design?

Peacock + Lewis’s Kenneth Hart, AIA, used a contextual approach. He kept the clubhouse’s existing character and added features that make the space work year-round.

Dining capacity grows by about a third to 631 seats. With the nano-walls closed and the adjoining multipurpose room opened, the Waterside level seats 206 indoors. Covered outdoor seats sit under louvered pergolas with ceiling fans, heaters, and retractable screens. New indoor-outdoor bars serve both floors. Three multipurpose rooms host card groups and private dinners and open up for extra dining when needed. The Waterside kitchen was relocated and expanded to serve the larger space.

How was the clubhouse funded?

Members approved a budget of up to $20 million, including a $1 million contingency. Funding comes from a member assessment, a portion of existing capital dues, and bank financing scheduled for repayment within 10 years.

When does the new clubhouse open?

The renovated clubhouse is scheduled to reopen in January 2027.

What does the transformation mean for a new member?

The clubhouse completes the current capital plan. New members join after the golf course, wellness center, tennis complex, and clubhouse have all been rebuilt or renovated, with the two largest projects shaped by member input before construction began.